The Division Road & CR 100 W Storm Water Management Improvements project consisted of re-grading and re-shaping the roadside ditch along the north side of Division Rd from 121 W Division Rd to 111 W Division Rd, replacing driveway culverts, removing the existing 24” CMP culvert carrying storm water from north to south under Division Rd, and installing a storm sewer structure and new RCP culvert under Division Rd. to convey runoff into the existing ditch south of Division Rd.
The outlet for the roadside ditch was originally a 24” CMP culvert, which was not located in the low spot and discharged directly into the farm field on the south side of Division Rd. The project moved the outlet for the roadside ditch to the low spot, with the new culvert conveying runoff from this point to the existing ditch south of Division Rd. The new outlet is a 24" by 38" RCP culvert under Division Rd and is fully operational.

This project was completed in July 2020.